Glastonbury - Case Study

For this restoration, we laid reclaimed Blue Lias flagstones over underfloor heating.

Our first job was to remove the existing floor and dig down to allow for hardcore, membrane, insulation and concrete.

Underfloor heating was then installed by a separate, qualified installer.

Having sourced reclaimed Blue Lias flagstones, we then laid in traditional courses , before carrying out our standard restoration process.

The room was then handed back to the client, ready for the kitchen fitters.